PROJECT NAME: Al-Galala Seawater Desalination Plant.
LOCATION: Ain Sokhna, Suez, Egypt.
DELIVERY DATE: October 2018.

Introduction

The work was carried out at stations located far apart in a mountainous area.
Despite the challenges, all required tasks were completed efficiently and in record time.

Details of works

  1. Installation of 4 MV-SWGR (24 cells), type: MCset4.
  2. Installation of 8 LV-SWGR (138 cells), type: BlokSet.
  3. Installation of 4 batteries 110 V with charger.
  4. Installation of 14 PLC panels.
  5. Installation of 4 transformers oil 250 KVA – 0.69/0.4 KV.
  6. Installation of 1 transformer oil 250 KVA – 22/0.4 KV.
  7. Installation of 2 transformer oil 5 MVA – 22/0.69 KV.
  8. Installation of 6 transformer oil 6 MVA – 22/0.69 KV.
  9. Assemble of 4 enclosures for transformers 1.5 M.
  10. Supply & installation of 4 adaptation flexible copper between TRs & panels.
  11. Supply & installation of 12 adaptation copper 6300A between TRs & Busway.
  12. Supply & installation of 3 adaptation copper 3200A between TRs & Busway.