PROJECT NAME: Renovation of Roud El-Farag & Abbasiya water stations.
LOCATION: Cairo, Egypt.
DELIVERY DATE: November 2017.

Introduction

Because we were very careful to prevent water outage any moment during our work, we have prepared a professional technical study and high accuracy designs.
So, we have manufactured the copper and supports before remove the old circuits.
It is worth mentioning that we achieved high level of safety in site with assist of safety manager from Schneider.

All this led to save time and execute our task on the fullest. Thus, we succeeded to satisfy the customer.

Details of works

  1. Providing the drawings and technical study to conduct the required modifications.
  2. Manufacturing and supplying the copper connections.
  3. Removal of old soft starter circuits.
  4. Installation of new soft starter circuits (150HP, 200HP, 350HP, 400HP).

You can watch the following videos for further details ⇊