Sunday, 23-04-2017
1) Installation of Busway 4000A.
2) Installation of RMU panel, type: SM6.
3) Installation of LV-SWGR, type: BLOKSET.
4) Supply & installation of Adaptation copper between TR & BW 4000A.
5) Laying & termination of cables (More than 6000m).
6) Supply manufactured copper bars.
■ The following video showing how was the workflow.