● Water and Power Stations : |
---|
Galala WTP
Ain Sokhna, Suez, Egypt.
01) Installation of 4 MV-SWGR (24 cells), type: MCSET4.
02) Installation of 8 LV-SWGR (138 cells), type: BLOKSET.
03) Installation of 4 batteries 110 V with charger.
04) Installation of 14 PLC panels.
05) Installation of 4 transformers oil 250 KVA - 0.69/0.4 KV.
06) Installation of 1 transformer oil 250 KVA - 22/0.4 KV.
07) Installation of 2 transformer oil 5 MVA - 22/0.69 KV.
08) Installation of 6 transformer oil 6 MVA - 22/0.69 KV.
09) Assemble of 4 enclosures for transformers 1.5 M.
10) Supply & installation of 4 adaptation flexible copper between transformers & panels.
11) Supply & installation of 12 adaptation copper 6300A between transformers & Busway.
12) Supply & installation of 3 adaptation copper 3200A between transformers & Busway.
For more details please click here
10th of Ramadan PWTP expansions with capacity 600,000 m³/day
10th of Ramadan City, Al-Sharqeyia, Egypt.
1) Laying of 53343 m cables (different kinds & sizes).
2) Termination of 2604 cables (different kinds & sizes).
3) Erection of 1900 m cable trays & ladders (different sizes).
4) Erection of 912 m conduits (different sizes).
5) Installation of 73 local Control Panel & Junction Box.
6) Installation of MV SWGR panels (22 cells), type: RoNEX.
7) Installation of MV panels (RMU), type: SM6.
8) Installation of LV panels (67 cells), type: BLOKSET.
9) Supply & installation of metal chassis for panel.
10) Supply & installation of enclosure.
11) Installation of 2 dry transformers 2500 KVA.
12) Installation of 2 oil transformers 800 KVA.
13) Installation & assembling of 96 batteries on base panel.
14) Installation of charger panel.
For more details please click here
Mostorod WTP expansion
Mostorod, Al-Qalyuobia, Egypt.
2) Installation of MV panels, type: RoNEX.
3) Installation of new MV Bus-way 11k
For more details please click here
Abbasyia & Roud El-Farag water stations modifications
Abbasyia & Roud El-Farag, Egypt.
2) Manufacturing & supply the connection copper.
3) Removal of old soft starter circuits.
4) Installation of new soft starter circuits (150HP, 200HP, 350HP, 400HP).
For more details please click here
Sheikh Zayed WTP expansion
6th of October City, Egypt.
1) Installation of MV SWGR panel (6 cells), type: RoNEX.
2) Installation of MV panel (10 cells), type: MCSET4.
3) Installation of MV panel (6 cells), type: SM6.
4) Installation of 5 LV panels (49 cells), type: BLOKSET.
5) Supply & installation of 2 side panel & Duct between cells.
Amriya WTP expansion
Amriya, Alexandria, Egypt.
2) Termination of 206 cables (different kinds & sizes).
3) Erection of 305m Trays (different sizes).
4) Erection of 81m conduits (different sizes).
Maamoura WTP expansion
Maamoura, Alexandria, Egypt.
2) Supply & Laying of 180m cables (different kinds & sizes).
3) Supply & installation of terminals for 26 cables (different kinds & sizes).
4) Supply & erection of 120m conduits ¾ inch.
5) Installation of earth bar 50×5mm with insulators.
Km 4.5 WTP modifications
4.5k, Nasr City, Cairo, Egypt.
2) Supply & Installation of 8 cables 240mm & termination of them.
New west Damietta power station
Damietta, Egypt.
2) Installation of LV panels (60 cells), type: BLOKSET.
3) Installation of 2 dry transformers (1.2, 1.5, 4M).
4) Installation of Busways 2500A, 3200A, & 6300A.
● Gas & Petroleum Stations : |
---|
Petrobel station
Abu Rudeis, South Sinai, Egypt.
2) Installation of LV panels (22 cells), type: BLOKSET.
3) Supply & Installation of 2 Adaptations 4000A & 2 boxes.
UGDC station
Port Said, Egypt.
1) Installation of LV panel, type: Blokset.
2) Installation of CT-4000A.
3) Installation of NSX-400A.
4) Laying of Cables.
SUMED station
Ain Sukhna, Suez, Egypt.
2) Installation of Busway 1200A.
3) Supply & Installation of Adaptation 1200A.
GASCO station
5th District, New Cairo, Egypt.
1) Retrofit & install of breakers NS1600 instead of CM1600.
● Steel factories : |
---|
Arcelor Mittal factory
Bader City, Egypt.
1) Installation of 4 MV cells (RMU), type: SM6.
Roots steel factory
6th of October City, Egypt.
1) Installation of Busway (with length 600 m & height 10 m).
Ezz El-Dekhila factory
Alexandria, Egypt.
1) Retrofit & install of breakers NS-1250 instead of ND-63F120.
2) Retrofit & install of breakers NS-1250 instead of NF-1200-SS.
Arco Steel factory
5 industrial Zone, Sadat City, Monofiya, Egypt.
1) Installation of 3 LV panels, type: BLOKSET.
2) Retrofit & installation of 20 breakers (100-4000A).
● Cement factories : |
---|
Tourah Cement factory (ASEC)
Helwan, Cairo, Egypt.
1) Supply & Installation of Adaptation 5000A.
2) Installation of breaker NW-5000A.
Titan Cement factory
Alexandria, Egypt.
1) Installation of MV panel (5 cells), type: RoNEX.
Sinoma Cement factory
Bani Swaif, Egypt.
1) Dismantling, perforation & installation of copper bars for incoming cables of MCSET cells.
● Chemical industries factories : |
---|
El-Nasr company for intermediate chemicals (NCIC)
Ain Sokhna, Suez, Egypt.
1) Retrofit of LV panels, type: BLOKSET.
2) Supply & installation of Adaptation copper between Breaker NW40 & Bus-way 4000A.
3) Supply & installation of Adaptation copper between Transformer & Bus-way 4000A.
4) Supply & installation of sheet metal box between Transformer & Bus-way 4000A.
5) Supply & installation of 2 Adaptations copper between Transformer & Bus-way 3200A.
6) Supply & installation of 2 sheet metal boxes between Transformer & Bus-way 2500A.
7) Design of all necessary drawings.
For more details please click here
Egyptian Fertilizer Company (EFC)
Ain Sukhna, Suez, Egypt.
1) Installation of MV panels, (Areva cubicles) type: WK.
● Medical Products factories : |
---|
EIPICO factory
10th of Ramadan City, Al-Sharqeyia, Egypt.
1) Supply & Installation of 9 Adaptations.
2) Remove & Installation of 4 Dry Transformer 2M.
3) Installation of 16 feeder Bus-ducts 4000A.
4) Installation of 2 Busduct line 6300A & 2500A.
5) Retrofit 3 Adaptations & 4 breakers NW-2000A, NW-4000A.
6) Supply 2 Adaptation 4000A, 6300A & boxes for Transformer.
Pharma Pack factory
6th of October City, Egypt.
1) Installation of MV SWGR panel (8 cells), type: MCSET4.
2) Installation of RMU panel (16 cells), type: SM6.
3) Installation of Busduct (more than 130 meters).
4) Supply & Installation of 4 Adaptations.
5) Termination of 20 MV cables.
6) Retrofit of Adaptation between Bus-duct & LV panel.
P&G Baby Care factory
6th of October City, Egypt.
1) Installation of Busway 4000 A.
2) Supply & Installation of Adaptations & boxes.
Glaxo Smith Kline factory (GSK)
Giza, Egypt.
1) Installation of 21 CT & Barometers.
2) Remove & Installation of LV panels.
Glaxo Smith Kline factory (GSK)
El-Salam City, Cairo, Egypt.
1) Installation of LV panel (9 cells), type: Blokset.
2) Laying of output cables(3×300mm) from RMU(SM6) to MV-SWGR.
3) Supply & install of ends of output cable (300mm) for RMU(SM6).
● Foods & Drinks factories : |
---|
BERICAB factory
6th of October City, Egypt.
1) Installation of LV panel (23 cells), type: BLOKSET.
2) Installation of 2 dry transformers.
3) Installation of Busways (800-4000A), with length more than 380m & height 8.5m.
4) Supply & Installation of 2 Adaptations 4000A.
Kraft foods factory
Burj Al-Arab, Alexandria, Egypt.
1) Retrofit & installation of breakers NSX(250-800)A.
Nestle factory
6th of October City, Egypt.
1) Installation of MV panel, type: MCSET.
2) Remove & installation of MV panel (RMU), type: SM6 4F.
3) Installation of LV-SWGR panel.
Nestle ice cream factory
6th of October City, Egypt.
1) Retrofit breaker NS 800A.
2) Supply & installation of iron sheets to cover breaker NS 800A.
Juhayna factory
6th of October City, Egypt.
1) Retrofit & installation of breakers NW-600A & NS-1000A.
2) Remove & installation of LV panel, type: BLOKSET.
3) Supply material for control devices.
4) Modifying control circuitry from manual to automatic.
AJE Egypt factory
6th of October City, Egypt.
1) Maintenance for motors 4HP.
2) Installation of overloads for LV panel.
3) Supply & installation of cables to connect panels.
4) Supply & installation of 3 floats.
Edita factory
6th of October City, Egypt.
1) Retrofit & installation of breakers NSX-400A & NSX-250A.
Mondelez factory
10th of Ramadan City, Al-Sharqeyia, Egypt.
1) Supply earth cables, terminals, ducts, stickers, & necessary accessories for retrofit LV panels.
Misr Glass Manufacturing factory (MGM)
Mostorod, Qalyubia, Egypt.
1) Remove 2 LV-SWGR, type: OKKEN (6300A).
2) Installation & retrofit of LV-SWGR (16 cells), type: OKKEN (6300A).
3) Installation of 2 Bus-way 5000A & 6300A.
4) Dry transformer 3150 KVA, IP21.
5) Supply & installation of Adaptation 6300A.
● Other Places & Factories : |
---|
Benha Electronics Renovation
Benha, Egypt.
2) Installing a new MV-SWGR.
3) Completing all necessary civil works & making a concrete zero level floor under the SWGR.
For more details please click here
Helwan Factory Renovation
Helwan, Cairo, Egypt.
1) Build a full room (5.8×2.5m), includes: floor & roof concretes, paints & lighting.
2) Build a concrete sidewalk (Includes: Supply the necessary materials).
3) Expand the new room from (5.8×2.5)m to (6.4×3.3)m.
4) Make a concrete base in front of the door of old room, with dimensions (2×2m) × thickness (40cm).
5) Make a concrete layer for the new room floor fully (3.3×6.4m), with thickness (15cm).
6) Drilling of 2 trenches to pass cables of 2 capacitor panel (Includes: supply iron cover).
7) Drilling of a new ground hole (1×1×3m) + fix copper plate (1×2)m×5mm + fix copper bar (10cm×10mm×3m) + laying of copper cable 50mm from the hole to the old room, to achieve 2 Ohm.
8) Optimize of 2 ground holes & connect it with panels.
9) Removal of tiles of old room roof, retrofit & insulation of the roof, & supply & erection new tiles & gutters to dispose the water.
10) Format the room floor & paint it by Epoxy (20×5.8m).
11) Paint a room with size (20×5.8×6m) from inside & outside.
12) Supply & installation of full lighting of the old rooms (Lamps/ Sockets/ Wires/ Pipes).
13) Supply & installation of 5 Air conditioning 2.5 HP (Includes: accesseries & copper pipes).
14) Supply & installation of 3 chasiss for MV panel & capacitor panel.
15) Supply & installation of cable terminals (3×240mm).
16) Supply & laying 35m of Aluminum cable (3×240mm).
17) Supply & installation of external sanitation materials.
18) Supply & installation of fire doors & windows.
19) Supply & install iron borders thickness (5×30mm) to protect 4 windows from outside.
20) Supply & install a fan (Toshiba) in the new room & 3 headlamps 1kW (El-Sewedy) over the building.
21) Removal & installation of 18 MV cells & 8 capacitor cells (Includes: remove & install cables).
22) Installation of transformer, batteries, & charger.
For more details please click here
International Drilling Material Manufacturing Co. (IDM)
Ain Sokhna, Suze, Egypt.
1) Installation of Busway 4000A.
2) Installation of RMU panel, type: SM6.
3) Installation of LV-SWGR, type: BLOKSET.
4) Supply & installation of Adaptation copper between TR & BW 4000A.
5) Laying & termination of cables (More than 6000m).
6) Supply manufactured copper bars.
For more details please click here
UPTOWN CAIRO City
Mokttam, Cairo, Egypt.
1) Installation of MV panels, type: (SF6, RONEX &MCSET4).
2) Installation of LV panels, type: BLOKSET.
3) Installation of ATS 45K.
4) Installation of capacitor bank.
Palm Hills City
6th of October City, Egypt.
1) Installation of protection devices.
2) Installation of 3 MN & phase sequence.
CPC complex
6th of October City, Egypt.
1) Supply & installation of 5 Adaptations 2500-4000A between transformers & Bus-way, with silverd plated.
2) Supply & installation of 2 Bus-way boxes.
IKEA store
Cairo Festival City, New Cairo, Egypt.
1) Installation of MCB panels.
2) Retrofit 5 Adaptations between panels, transformers & Busway.
6th of October University
6th of October City, Egypt.
1) Installation of MV panels , type: SF6.
LOREAL factory
10th of Ramadan City, Al-Sharqeyia, Egypt.
1) Remove & installation of NSX (100A : 1600A).
2) Installation of micro logic (2.3 & 5).
GSE factory
6th of October City, Egypt.
1) Installation of 6 LV panels, type: BLOKSET.
2) Laying of 40 meters (special cables).
3) Termination of 16 cables.
Development Services Center
Maadi, Cairo, Egypt.
1) Supply & installation of 5 Adaptations (2000A).
2) Supply & installation of 5 Adaptations (1600A).
Cairo Financial Center (CFC)
Mokattam, Cairo, Egypt.
1) Supply & installation of Adaptation between breaker NW20 & Busway.
2) Retrofit of Adaptation between breaker NW25 & Busway.
Sahl Hasheesh for solar energy (KarmSolar)
Hurghada, Red Sea Governorate, Egypt.
1) Supply & installation of flexible link between transformer & copper of LV panel.
Sign Electric © 2024 - All Rights Reserved